Foster Park Relief Sewer

City of Fort Wayne, IN

Tunneling

Mechanical

Sewer

Structural Concrete

3800 LF of 72” FRP Interceptor sewer (up to 37’ deep), 1800 LF of 48” FRP Interceptor sewer, 3200 LF of 36” Force main, 300 LF of 42” Force main, 550 LF of 10”, 12”, 30”, and 36” HDPE sanitary sewer siphons under the St. Mary’s River, 200 LF of 66” FRP interceptor sewer, 3 cast in place diversion structures including slid gates, flap gates, and screening equipment (approx. 40x20x 35’ Deep each), 3 Siphon head and tail boxes, dewatering, excavations up to 37’ deep, and other misc 24” to 48” sanitary sewer connections, 60” and 54” Jack and bores under USACOE Levy.

Dunigan Bros. excavator lifting large diameter pipe on an underground utility project
Dunigan Bros. crew members performing shoring and excavation support work in an open cut trench
Dunigan Bros. crew members pouring structural concrete in a deep foundation excavation
Dunigan Bros. crew members and heavy equipment on an active road excavation project
Dunigan Bros. excavator digging an open cut trench on an underground utility project in a residential area

US-12 Sewer Improvements

Pittsfield Township, MI 

Watermain

Tunneling

15,000 LF of 36” FRP Interceptor Sewer at depths up to 43’, average depth approx. 30’, FRP Manholes, 4100 LF of 8-12” sanitary sewer, misc storm sewer, approx. 350 temp dewatering wells, 2 miles of road construction, ditching, restoration, 710 LF of 54” auger boring (single bores up to 400’ long), and abandonment of 2 existing lift stations.

Dunigan Bros. excavator performing mass excavation on an active construction site
Dunigan Bros. excavator on an active road construction and underground utility project
Dunigan Bros. excavator and crew members on an underground utility project with pipe on the ground
Dunigan Bros. crane positioning large diameter concrete casing on a tunneling and boring project
Dunigan Bros. aerial view of underground utility installation along a road corridor in winter conditions

Ultium 3 Battery Plant

Delta Township, MI

Trenchless

Mechanical

Water

Sewer

25,000 LF of 20” WM, 10” FM, and 12” FM, 140 LF of 36” Auger Boring, HDD, and Site restoration, Installation of 32’ Deep triplex lift station, site piping, metering manholes, sampling structures, and tie ins of existing utilities.

Aerial view of Dunigan Bros. active construction site with equipment and crew along a roadside corridor
Dunigan Bros. Komatsu excavator and Vermeer boring machine on an active trenchless construction site
Dunigan Bros. excavator and crew members on an active underground utility project
Dunigan Bros. crew members installing pipe in an excavated trench with heavy equipment on site
Dunigan Bros. construction site under a highway overpass with crew and equipment

US-127 Reconstruction

MDOT, Michigan

Tunneling

Dunigan Bros. excavator, crew members, and large diameter pipe on an active underground utility project

240 LF of 54” Steel casing by jack and bore, 935 LF of 36” Steel casing by jack and bore (including multiple guided pilot tube crossings), 894 LF of 48” Steel casing by jack and bore, and 304 LF of 42” Steel casing by jack and bore.